Heath-consultants GT Series Manuel d'utilisateur Page 38

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 170
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 37
3-16
USER HANDBOOK
The screen, shown in Fig. 3.24, is displayed when
the Service date has expired. i.e. overdue.
Fig. 3.24 Switch OFF
To proceed with the switch-off sequence:
Press and hold both the LH button and the RH
button simultaneously.
Warm-up Complete
The instrument will now automatically select the Leak
Test Mode, as default.
The following configurable options are available:
a) To start up in specific operational mode.
b ) To start up in the mode last used.
Vue de la page 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 169 170

Commentaires sur ces manuels

Pas de commentaire